Steel Building Installations
Steel Building Installations
Pre-Engineered Building Installation Services (Erection and Sheeting)
We Are One of the leading well reputed structural steel building Erection Service
Providers in India Offering World Class Structural Steel Building To Meet certified
quality standards and complete client requirements Our company also has a complete
set of erection tools and Tackles Our company also has well experienced erection
teams and site engineers. in Order to ensure clients satisfaction in terms of
quality and price.
We are the certified PEB Installation Vendors for the below companies
- TATA Bluescope Steel Ltd.
- Pennar Engineered Building Systems Ltd.
- Kirby Building Systems India Ltd.
- Contour Steel Engineering India Ltd.
- Multi Colour Steel Projects India Ltd.
- Interacrh Building Products Pvt. Ltd.
PEB Erection and Sheeting Procedure.
Ground Condition/Site preparation:
- Visit to site and understand the ground conditions suitable for erection.
- Identification of space in consultation with client near to the structure for
unloading of material
and for painting.
- Firm Floor surface and ramp for movement of crane within the building area.
- 3m wide plain surface all around the periphery for the movement of scaffolding.
- Source of electricity and water supply for sheeting and water testing purpose.
- Provision for labour accommodation within or near the site.
- Suitable storage arrangement to be provided by the client for safety & security
of fasteners and
other small materials.
Project Planning:
Log Book:
Log book is maintained at the site by the supervisor which contains:
- No. of working staff per day per activity.
- No of hoisting equipments, tools tackle machinery etc.
- Details of material received (load wise), date, discrepancy if any as mentioned
on the back side of LR Copy.
- Painting, equipments & labour.
- Erection/Activity status report (date wise).
- Anchor Bolt setting Report.
- Torque tightening Report.
- Alignment Report.
Safety Equipments:
- First aid kit at site.
- All workers and personnel strictly wears PPE.
- Firm Ladders have to be provided for the access of workers to reach the roof
level. Purling Challis and man basket Must be provided at site for Safe
erection.
- Lifelines have to be provided for fixing the secondary members and during roof
sheeting for the workers to hook their safety belts.
- Electrical distribution board are used with required industrial sockets &
switches for safe working.
- Electrical cables tested for cuts/burns prior to the usage.
- Movable scaffolding for fixing of secondary members and for cladding works.
- Trolley for holding DA and oxygen cylinders in vertical position.
- Cordoning off roof openings till openings are closed.
- Cordoning off erection area from other agencies to enter.
- Crane/hydra tested for safety prior to erection.
- Ensuring supervisor/engineer to conduct toolbox meeting on daily basis.
- Safety display boards & logbook containing contact numbers maintained at
site.
Painting:
- Colour, type, brand, no of coats, Ral Number confirmed with the client.
- Sufficient inventory of paint is maintained at the site.
- Proper touch up after erection is carried out.
- Painting equipments like brush/compressors are arranged adequately.
Tools, Tackles, Equipment and machinery
- List of all erection and sheeting related tools used at site are mentioned.
Manpower:
- Details of each and every worker including name, age, address, photo ID and
skill test maintained till the final handover of the building to the client.
Erection:
- Thorough checking of anchor bolts with respect to line, levels, locations and
critical dimensions carried out and anchor bolt report is submitted before
commencing erection.
- Thorough checking of material with respect to packing list, shipper list and
drawing done prior to commencing erection.
- Painting of structural members as per the priority of erection.
- Type of lifting equipments/crane as required for erection (capacity & boom
height).
- Scaffold as per the height of the structure.
- Thorough studying of drawing by the site engineer/supervisor.
- Erection to start with a braced bay in all types of structures.
- Where span (width) is less than length of structure proceed erection bay wise.
- Where span (width) is more than the length of structure proceed erection module
wise.
Roof, Wall cladding and Finishing:
Before starting any sheeting work, we check for complete alignment of the portion of
structure to be sheeted and submit alignment Report to the PEB. Supplier’s Engineer.
- Calculation of manpower and machinery required for the sheeting area.
- Mobile scaffold to carryout the wall cladding.
- Sufficient props or wooden supports to be provided from ground level for grits
which are sagging before cladding.
- All purling to be straightened before roof sheeting.
- Proper scaffold or firm ladder /staircase to reach the roof top.
- Check the diagonals of the first layer of sheets both for roof and wall
cladding.
- Proper method of screwing of roof as well as wall sheeting.
- Fixing of mastic tape for roof sheeting with proper overlaps of sheets as
specified.
- All flashings & trims are properly lapped and aligned.
- All closures are properly sealed and screwed such that they are firmly fixed.
- Gutter and downspouts are aligned properly.
- For tightening of screws, screwing machines with depth gauge sockets are used.
- Life lines fixed such that all sheeting team working at heights use it for
hooking the safety harness belt.
Water Test and Handing Over:
- Water test for testing the roof is made in the presence of client/consultant
representative. The arrangement for the same is also done in accordance with the
client representative. Leakages, if any are immediately sealed and re water test
is conducted.
Statutory Obligations:
We comply with all statutory, labour, laws, and minimum wages and maintain the necessary records at site.
- We submit the proof of payment made to ESI & PF.
- We submit the workmen compensation policy/ ESI details to clients within one week from receipt of Work Order, With work schedule.
If You Need Any Industrial Solution ... We Are Available For You
Contact Us